Question no 3361 : Last Lot Exact

In SAP MM or PP in MRP planning as at ECC6.0 EhP6, the implementation of "Last Lot Exact" for Quantity determination can be done via which of the following ?

(only one answer)

A)   MRP Type.
B)   Time Fence.
C)   MRP Strategy.
D)   Availability Check Group.
E)   Lot Size Key.
.

1 comment:

  1. Answer: E

    Via the Lot Size Key in the IMG, there is a a parameter setting for "Last Lot Exact".