Question no 3243 : Maintenance Plant

In SAP PM as at ECC6.0 EhP6, which of the following can be assigned to Maintenance Plant ?

(more than one answers)

A)   Planner Group.
B)   Maintenance Work Center.
C)   Technical Object.
D)   Permits.
E)   Measuring Point.

2 comments:

  1. The main function of Maintenance Plant is for creation of Maintenance Work Center and assignment to the Technical Object to identify location of the Technical Object.